University of Western – Lambton Hall

Client: University of Western – Lambton Hall
Size: 6,700 sq. ft.
Project Completion Date: October 2016
Region: Kitchener, Ontario
Project Included:

  • Installation of new 2ply modified bitumen roof system

This roofing project was completed in August 2017. We removed the existing PVC membrane, insulation and tapered fiberboard back-slope at the perimeter down to the existing 2ply #15 perforated felt vapor retarder. We adhered the tapered fibreboard back-slope around perimeter edge and tapered drain sumps in low-rise foam adhesive. We adhered a second layer of Poly ISO insulation in low-rise foam adhesive. We installed a 2ply modified bituminous roof system.